Skip to content
Back to latest news

Archive

Every rail news update we have published, newest first.

Page 4 of 14

Tag der Schiene 2026: DB opens construction sites, main station and Maschen marshalling yard in northern Germany

From 18 to 20 September 2026, Deutsche Bahn is inviting visitors in northern Germany to numerous events. Highlights include the construction site of the new Sternbrücke in Hamburg-Altona, guided tours of Hamburg Hauptbahnhof and an open day at Europe's largest marshalling yard in Maschen.

Read more

Tag der Schiene 2026: Deutsche Bahn opens construction sites, main station and Maschen marshalling yard in the north

From September 18 to 20, 2026, Deutsche Bahn is inviting visitors in northern Hamburg to construction site tours, behind-the-scenes insights at the main station and an open day at the Maschen marshalling yard. Highlights include the new Sternbrücke in Altona and Europe's largest marshalling yard.

Read more

Day of Rail 2026: Deutsche Bahn opens works, construction sites and signal boxes in Baden-Württemberg

From September 18 to 20, Deutsche Bahn invites visitors in Baden-Württemberg to the nationwide Day of Rail. At ten locations – from Ulm via Stuttgart and Pforzheim to Basel – the company offers insights into infrastructure, construction projects and day-to-day rail operations. Some offerings are already fully booked, while registration is available for many more.

Read more

S-Bahn line Cologne–Düsseldorf closed until December: Connection to full closure on key NRW axis

Following the full closure between Cologne-Mülheim and Düsseldorf Hbf, the next construction phase follows immediately: Until 4 December, the S-Bahn route is closed again. The reason is bundled maintenance work around the RRX expansion, the barrier-free conversion of Düsseldorf-Benrath, and extensive track and bridge work.

Read more

Tag der Schiene 2026: Deutsche Bahn opens Right Rhine Corridor construction sites to visitors

From September 18 to 20, 2026, Deutsche Bahn invites visitors to three guided construction site tours along the Right Rhine line in Bad Hönningen, Braubach, and Koblenz-Ehrenbreitstein as part of Tag der Schiene.

Read more

Day of Rail 2026: Deutsche Bahn opens construction sites, signal boxes and main stations in Hesse

From 18 to 20 September, Deutsche Bahn invites the public to the Day of Rail in Hesse. Interested parties can experience construction site tours, historical guided walks and insights into the Frankfurt Operations Centre – however, many time slots are already fully booked.

Read more

BVG invites couples to a Tra(u)m wedding: tram becomes a wedding carriage on 11 October

Berliner Verkehrsbetriebe (BVG) is offering three couples a free symbolic wedding ceremony in a tram. Applications are open until 23 September 2026.

Read more

BVG turns a streetcar into a wedding carriage: three couples can marry in a tram on 11 October

Berliner Verkehrsbetriebe (BVG) is enabling couples in love to hold a free wedding ceremony in a streetcar – including a romantic ride from the Weißensee depot via the M4 line to Hackescher Markt. Applications are open until 23 September.

Read more

Deutsche Bahn prepares for Oktoberfest rush: More than 500 additional S-Bahn services to Munich

Deutsche Bahn expects around 100,000 additional passengers daily in Munich during Oktoberfest. Despite ongoing construction work at the main station, all platforms are to remain open and more staff are to be deployed.

Read more

S-Bahn chaos in Berlin: Seven lines suspended from Friday evening to early Monday

From Friday, 22:00, until Monday, 1:30, seven S-Bahn lines in Berlin are completely or partially cancelled. The route between Südkreuz and Anhalter Bahnhof as well as the Ringbahn between Halensee and Beusselstraße are particularly affected. Accessible replacement buses are in operation.

Read more

Tree blocks U-Bahn tracks in Hamburg-Volksdorf – U1 train evacuated

A fallen tree lay across the tracks of the U1 line on Tuesday evening at around 8:30 p.m. About 25 passengers had to disembark and walk back to the station.

Read more

ICE door opened at 200 km/h – investigations ongoing

An ICE door opened at high speed in Lower Franconia. The Federal Police are still searching for the person responsible.

Read more

Kurhessenbahn launches test operations with three battery trains in the Nordwesthessen network

Three battery-electric multiple units of the "Mireo Plus B" type will gradually replace diesel railcars on the RE39, RB38, RB39 and RB94 lines from autumn 2026. The five-year pilot operation by DB RegioNetz Kurhessenbahn, NVV, RMV and NWL is intended to demonstrate how BEMU vehicles can be deployed economically on non-electrified routes.

Read more

Red Bull race car on Madrid's metro tracks: Show run ahead of the Formula 1 weekend

Just before the Madrid Grand Prix, a Red Bull Formula 1 race car created spectacular images on metro tracks in the Spanish capital. The clip shows the race car on the tracks of Madrid's metro network.

Read more

Siemens demonstrates fully automated train in Berlin

Siemens has presented a fully automated train on a Berlin mainline railway. The system uses a combination of software, radar, camera and lidar to detect obstacles as well.

Read more

Stuttgart S-Bahn core line set to reopen after eight-week closure

After an eight-week full closure of the Stuttgart S-Bahn core line, tracks, switches, escape routes and power lines are nearing renewal. There is also news from Baden-Württemberg regarding the strike in SWEG bus services and the Gäubahn debate.

Read more

From Glass Pavilion to Problem Child: Offenbach's S-Bahn Station Marktplatz Loses Its Shine

Opened in 1995 as a transparent showcase station, the S-Bahn stop at Offenbach's Marktplatz now struggles with broken escalators, littered platforms and fragmented responsibilities. An insider explains how a dream start turned into years of decline – and what hope a new target image for Germany's stations by 2035 brings.

Read more

Train derails in Allgäu after collision with fallen tree

A regional train in the Ostallgäu region collided with a tree toppled by a storm during severe weather and subsequently derailed. According to police, no one was injured.

Read more

S-Bahn Station Offenbach Marktplatz: From Flagship Stop to Renovation Case

The S-Bahn station at Offenbach's Marktplatz, opened in 1995, was once considered a flagship project with glass architecture and its own stationmaster. Today the stop struggles with broken escalators, litter, and the closure of its kiosk – a symbol of the changing Deutsche Bahn.

Read more

Closure near Fulda: These ICE stops are cancelled until 27 July in Thuringia

Due to a short-notice switch replacement near Fulda, the Fulda–Frankfurt line will be closed from 13 July (10 pm) until 27 July. Deutsche Bahn is rerouting or cancelling ICE services – with noticeable consequences for travellers in Thuringia.

Read more

Two-day Verdi warning strike paralyzes buses in Schleswig-Holstein's major cities

From Wednesday to Thursday (8/9 September 2026), bus services of the municipal transport operators in Kiel, Lübeck, Flensburg, and Neumünster, as well as in the district of Plön, will be canceled. Verdi is urging around 1,800 employees to join the warning strike – no emergency services are planned.

Read more

Leipzig: Construction site on Prager Straße – tram and bus lines running as scheduled

From 7 September, Leipziger Wasserwerke is renovating combined sewer pipes and drinking water lines on Prager Straße between Gerichtsweg and Ostplatz. There will be closures for car drivers, but public transport is running as scheduled.

Read more

Czech Railways tests pure HVO fuel in RegioFox trains in regular service for the first time

České dráhy is expanding its tests with biogenic fuels: Three RegioFox diesel multiple units from the Rakovník depot will in future run on fully biogenic HVO on routes in Central Bohemia. Following a 20-percent HVO trial since April 2025, the company is taking a further step towards reducing local emissions on non-electrified lines.

Read more

Vienna: Southern closure of the S-Bahn core line begins – diversion routes and construction works until October 2027

From 7 September, the Praterstern–Hauptbahnhof section will be scheduled closed for around 14 months. At the same time, the northern section Floridsdorf–Praterstern goes back into service. What passengers need to know.

Read more

Search guides, news, routes...

↑↓ Navigate Enter Select Esc Close
Powered by Pagefind
Book your tickets